Applying a moisture barrier prior to the engineered flooring...

A post shared by LM Projects (@lmprojectssyd) on



Applying a moisture barrier prior to the engineered flooring going down. 🎨 This provides a secondary barrier against any moisturise rising out of the slab as a just in case. It also allows us to direct stick the engineered board to the slab giving a more solid feel underfoot than traditional timber battens and the adhesive also contains acoustic properties to reduce drumming 🥁 (at North Sydney)