24 Aug, 2018

@widelinewindows breezeway louvres leading into the living room...

@widelinewindows breezeway louvres leading into the living room with breezeway automated louvres above to the backyard northern aspect to utilise the summer breeze for cross flow ventilation. 🌬 @ja ...

8 Aug, 2018

@havwoods_au graupa engineered flooring going down at North...

@havwoods_au graupa engineered flooring going down at North Sydney this week. Really digging the tones and colours featured in this 180mm wide board🔨👌🏻 (at North Sydney)

8 Aug, 2018

The best way to finish your week is to plan for the one ahead...

The best way to finish your week is to plan for the one ahead and sometimes that requires new tools. I’d be lying if I said I still don’t get excited when I walk into @totaltoolstarenpo ...

8 Aug, 2018

Scyon Linea weatherboard cladding installed and...

Scyon Linea weatherboard cladding installed and looking fresh. I’ve always loved the way cladding breaks up the external wall surfaces and adds another level of finish to the exterior. (at N ...

27 Jul, 2018

Applying a moisture barrier prior to the engineered flooring...

A post shared by LM Projects (@lmprojectssyd) on Jul 27, 2018 at 1:16am PDT Applying a moisture barrier prior to the engineered flooring going down. 🎨 This provides a secondary barrier against an ...

24 Jul, 2018

With the plastering completed to North Sydney we can now charge...

With the plastering completed to North Sydney we can now charge ahead with the internal fit out. Square set throughout for that clean and modern look. We choose to only use 13mm plasterboard as oppose ...

Previous. 1 2 3 4 5 6 7 8 9 Next